Offices | Currently Browsing: USA

United States

Structure Tone | LF Driscoll “tops out” JSUMC’s HOPE Tower cancer center
Structure Tone is a global leader in construction management and general contracting services with offices located in the US, UK, and Ireland. Founded in 1971, the company is among the world’s top twenty construction companies worldwide, responsible for more than $3.5B in annual construction volume.
24371
single,single-post,postid-24371,single-format-standard,mkd-core-1.0.2,ajax_fade,page_not_loaded,,onyx child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_470,wpb-js-composer js-comp-ver-4.12,vc_responsive
 

LF Driscoll “tops out” JSUMC’s HOPE Tower cancer center

LF Driscoll “tops out” JSUMC’s HOPE Tower cancer center

The final beam of Jersey Shore University Medical Center’s HOPE Tower was placed on September 15, 2016, marking a major milestone in the construction of the new 10-story cancer research and treatment center in Neptune, New Jersey.

LF Driscoll is leading the construction of this 299,000sf medical tower, which will serve as the home of Meridian Research Services and the hospital system’s medical education programs. The building will house a dedicated Meridian Cancer Care center, outpatient imaging services, a clinical academic center, and an innovative simulation laboratory. Construction also includes an associated 9-story parking garage that will accommodate 1,500 parking spaces.

JSUMC Hope Tower Top Out - LF Driscoll

“HOPE Tower is such an exciting expansion for us because it represents what we’ve accomplished as an academic medical center, and our continuing commitment to providing the most innovative, patient-centered health care experience,” says Dr. Kenneth N. Sable, JSUMC president. “The topping out ceremony is an opportunity to recognize the dedication of team members and the construction crew that have made this vision a reality, and it’s a celebration of what the future holds for Jersey Shore and the community we serve.”

The HOPE Tower is on schedule to be completed in 2018. The project was designed by WHR Architects and project management services are led by Stantec.

JSUMC Hope Tower Top Out - LF Driscoll