Offices | Currently Browsing: USA
Workday - Structure Tone
Structure Tone is a global leader in construction management and general contracting services with offices located in the US, UK, and Ireland. Founded in 1971, the company is among the world’s top twenty construction companies worldwide, responsible for more than $3.5B in annual construction volume.
31363
projects-template-default,single,single-projects,postid-31363,mkd-core-1.0.2,ajax_fade,page_not_loaded,,onyx child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_470,wpb-js-composer js-comp-ver-4.12,vc_responsive
Workday, Dublin
Workday, Dublin
Workday, Dublin
Workday, Dublin
Workday, Dublin
project

Workday, Dublin Ireland

Structure Tone delivered the office fit-out for Workday after competitively bidding the project and demonstrating a clear understanding of the different build requirements.

Project was undertaken over three phases on a fast-track programme, from March 18th to October 2nd, 2015. Undertaken in an existing building which was at a Cat A finish, phases two and three were undertaken while the space was being occupied.

The project included renovation of the ground floor area encompassing reception, open plan offices, training rooms, IT labs and shower facilities. The fourth and fifth floors include open plan offices, meeting rooms, huddle spaces, scrum areas, micro-kitchens and pods. The sixth floor includes canteen facilities and games area. Structure Tone reconfigured and supplemented existing M&E plant and equipment.

Because acoustics are key to Workday, strict acoustic deliverables were set out and achieved. 50 dB Dw sound insulation was provided between all rooms. We achieved 35 dB Laeq, T in the open plan spaces. To minimize background noise, we installed a suspended ceiling grid, acoustic rafts and panel walls. This low level of background noise had never been achieved before in Ireland in this type of built environment.

We managed the installation of de-bonded polished concrete floor in the reception area as well as an exposed concrete reception desk. The multiple exposed services areas were constructed and finished to a very high standard. Over the course of the three phases, 572 desks were installed in total.

©Donal Murphy Photography

sectors

services

Client

Workday

Location

Kings Building
Church Street, Dublin

SF

80,000

Architect

IA Interior Architects

Dates

2015

Contract

RIAI Blue Form

Owner’s Rep

Lafferty

Engineer

ARUP

Quantity Surveyor

AECOM

related projects