Offices | Currently Browsing: USA
Preconstruction - Structure Tone
Structure Tone is a global leader in construction management and general contracting services with offices located in the US, UK, and Ireland. Founded in 1971, the company is among the world’s top twenty construction companies worldwide, responsible for more than $3.5B in annual construction volume.
31393
services-listing-template-default,single,single-services-listing,postid-31393,mkd-core-1.0.2,ajax_fade,page_not_loaded,,onyx child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_470,wpb-js-composer js-comp-ver-4.12,vc_responsive
Services

Preconstruction

Structure Tone believes that the efforts put forth in the time leading up to the start of construction are critical to the success of a project. When preconstruction services are implemented, the decisions made during this phase can significantly save clients time and money.

Throughout the preconstruction services phase, Structure Tone staff provides guidance on selection of materials, building systems, equipment, and methods of project delivery. We evaluate and make recommendations on the availability of materials and labor, time requirements for procurement, installation, and factors related to cost, including but not limited to the cost of alternative designs or materials.

During preconstruction, the project is fully programmed from all aspects of budgeting and pricing to schedule and project execution. It is during preconstruction that the plan is developed, and during construction when it is executed. Key services provided during preconstruction include:

  • Value management, providing practical recommendations for constructability, including analyzing building systems, materials, finishes and equipment.
  • Innovative developments to improve quality.
  • Pricing for labor and materials today and for the project duration.
  • Projected labor availability in key trades, local work practices, labor agreement obligations, trade restrictions, and jurisdictional assignments.
  • Trade-by-trade budgets at various levels of design refinement.
  • Schedules including milestone, critical path, and bar chart schedules that highlight long-lead items, procurement timetable, and critical decision points.
  • Prepurchase and fabrication of long-lead and/or early start items
  • Cost-reporting procedures, flow of information, administration of general conditions, and deployment records for cost and manpower.
  • Assessment of construction feasibility, ease and speed of construction, and use of labor-saving, off-site fabrication or pre-assembled building systems.
  • Site logistics planning to optimize the flow of workers, materials, and equipment to and from the building site, with a strong emphasis on safety and minimum impact to on-going site or area operations.
  • Development of safety programs, planning for temporary project facilities, equipment, materials, and services for common use by subcontractors.
  • Bid package coordination and subcontractor prequalification.

“Working with the folks at Structure Tone was wonderful. From preconstruction through completion they were true dedicated professionals. Their knowledge and experience with construction was extremely helpful with permitting and planning. They made the process smooth and met their completion date without any issues.”

– Michael McCaffrey,
CFO, American Red Cross of Massachusetts Bay

related projects