Offices | Currently Browsing: USA
Standard with Sidebar - Structure Tone
Standard with Sidebar
5706
paged,page-template,page-template-blog-standard,page-template-blog-standard-php,page,page-id-5706,paged-14,page-paged-14,mkd-core-1.0.2,ajax_fade,page_not_loaded,,onyx child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_470,wpb-js-composer js-comp-ver-4.12,vc_responsive
 
Ensure your news is read with Onyx blog.

Pioneering Infection Control: Prefabricated Infection Control Panels

Containing dirt, dust and bacteria on any interior jobsite is crucial, but when working in an occupied healthcare facility, the stakes are even higher. After years of juggling the tight schedules and stringent protocols of active healthcare facilities, the Structure Tone organization’s healthcare experts set out to find a more efficient way to handle infection control requirements.   In the world of healthcare, service is around-the-clock, and the facilities need to keep up. For most healthcare organizations, shutting down an entire hospital wing to accommodate construction is simply not an option. So,...

Read More

It’s All About the Plan: Capital One Toronto

For some projects, the challenges that pop up in the field can be the biggest hurdles. For others, the real problem-solving comes before construction begins. When Capital One wanted to consolidate its Toronto offices under one roof, the biggest challenge was time. They had just under a year to get through the design and construction of 120,000sf over 5 storeys AND move their staff from the old space to the new. "It was a very tight timeframe," says Hany Younan, project manager for Govan Brown, who Capital One hired to lead construction....

Read More